
Marulan Roadhouse Northbound
Hume Highway, Marulan, 2579
BP Pulse doesn't share live availability for this site yet.
- Price
- 55c/kWh
- Reported by drivers
- Fastest charger
- 75 kW
- Open
- See site
What a charge costs here
10% to 80%, at this site's fastest charger your car can use.
- Tesla Model Y Long RangeAbout 45 min, adds 310 km$28.88
- MG4 Long RangeAbout 40 min, adds 260 km$23.75
- Kia EV6 Long RangeAbout 50 min, adds 300 km$29.80
Chargers
- CCS75 kW
- CHAdeMO75 kW
Data from Open Charge Map contributors (CC BY 4.0), checked 21 Nov 2026.
Nearby chargers
Questions
- How much does it cost to charge at Marulan Roadhouse Northbound?
- 55c/kWh, as reported by drivers. A 10–80% charge in a Tesla Model Y Long Range costs about $28.88.
- How fast are the chargers at Marulan Roadhouse Northbound?
- The fastest charger here is 75 kW, with CCS, CHAdeMO plugs. A Tesla Model Y Long Range goes from 10% to 80% in about 45 min.
Know before you go
Roadtrip shows which chargers are free on your route, what charging will cost for your car, and the cheapest fuel when you're not plugging in.
Rated 4.7 by drivers · 700,000 downloads
