
Metis N4 Construction
200 Main St, Winnipeg, MB R3C 1A8
the operator doesn't share live availability for this site yet.
- Typical price
- ~62c/kWh
- Typical for ultra-rapid chargers in the country
- Fastest charger
- 200 kW
- Open
- 24/7
What a charge costs here
10% to 80%, at this site's fastest charger your car can use.
- Tesla Model Y Long RangeAbout 25 min, adds 310 km~$33
- MG4 Long RangeAbout 25 min, adds 260 km~$27
- Kia EV6 Long RangeAbout 20 min, adds 300 km~$34
Costs use the typical price for ultra-rapid chargers in the country; this site's own price isn't published.
Chargers
- CCS (Type 1) ×4200 kW
- Type 1 Tethered ×47 kW
Data from U.S. Department of Energy, Alternative Fuels Data Center, checked 21 Nov 2026.
Nearby chargers
Questions
- How much does it cost to charge at Metis N4 Construction?
- The operator doesn't publish this site's price. About 62c/kWh is typical for ultra-rapid chargers in the country.
- How fast are the chargers at Metis N4 Construction?
- The fastest charger here is 200 kW, with CCS (Type 1), Type 1 Tethered plugs. A Tesla Model Y Long Range goes from 10% to 80% in about 25 min.
- Is Metis N4 Construction open 24 hours?
- Yes, the chargers at Metis N4 Construction are listed as open 24/7.
Know before you go
Roadtrip shows which chargers are free on your route, what charging will cost for your car, and the cheapest fuel when you're not plugging in.
Rated 4.7 by drivers · 700,000 downloads
