
South River Brewing Co
309b Hwy 124, South River, ON P0A 1X0
IVY doesn't share live availability for this site yet.
- Typical price
- ~48c/kWh
- Typical for rapid chargers in the country
- Fastest charger
- 50 kW
- Open
- See site
What a charge costs here
10% to 80%, at this site's fastest charger your car can use.
- Tesla Model Y Long RangeAbout 1 hr 10 min, adds 310 km~$25
- MG4 Long RangeAbout 60 min, adds 260 km~$21
- Kia EV6 Long RangeAbout 1 hr 10 min, adds 300 km~$26
Costs use the typical price for rapid chargers in the country; this site's own price isn't published.
Chargers
- CHAdeMO ×250 kW
- CCS (Type 1) ×250 kW
Data from U.S. Department of Energy, Alternative Fuels Data Center, checked 18 Nov 2026.
Questions
- How much does it cost to charge at South River Brewing Co?
- IVY doesn't publish this site's price. About 48c/kWh is typical for rapid chargers in the country.
- How fast are the chargers at South River Brewing Co?
- The fastest charger here is 50 kW, with CHAdeMO, CCS (Type 1) plugs. A Tesla Model Y Long Range goes from 10% to 80% in about 1 hr 10 min.
Know before you go
Roadtrip shows which chargers are free on your route, what charging will cost for your car, and the cheapest fuel when you're not plugging in.
Rated 4.7 by drivers · 700,000 downloads
